APPLE SOLUTIONS LTD - Building & Refurbishment Contractors

  1. Home
  2. About us
  3. Residential
  4. Commercial
  5. Office Refurbishment
  6. Case Studies
  7. Why Choose Us
  8. Contact us

Case Studies

Here are some case studies that showcase exactly how Apple Solutions has delivered such an excellent service for our clients.

Filter studies by:

  • Commercial Case Study – Leonard Cheshire Disability

    Picture 02L

    Client Leonard Cheshire Disability
    Location Greenacres, Sutton Coldfield, Birmingham.
    Project Modernisation schemes – lounge refurbishment and new kitchen.

    As part of Leonard Cheshire disabilities ongoing modernisation schemes to various sites, a lounge refurbishment and new kitchen for those with special needs was required at Green Acres site in Sutton Coldfield Birmingham.

    Lounge

    We had to disconnect and make safe all electrical sockets and lighting, then the existing suspended ceiling was taken down along with the timber roof light surround which was stopping natural light.

    All walls were stripped of wallpaper, all first fix electrical work was finished, the extended half of the room was re-plastered completely as the original plaster was completely rotten and was falling off the walls.

    The original skirting board was taken off, and once the walls were plastered and lined with lining paper, the new skirting was fitted then a bulkhead was built to accommodate the new suspended ceiling and to give a finish between the lounge and the dining room.

    The existing doors were taken off and vision panels were fitted with fire rated George wire glass. The floor was then latexed in preparation of the new commercial non-slip wood effect vinyl floor.

    The new roof light dome was fitted which allowed more natural light into the room, and finally the room was decorated and the new vinly floor was laid.

    Kitchen

    We had to disconnect and make safe all electrical sockets and lighting and plumbing then the existing kitchen was taken out, all the existing tiles were taken off the walls.

    The existing door and frame was taken out and the opening was enlarged to allow for adequate wheel chair access. A new UPVC double glazed window was fitted so as to give more natural light within the kitchen. All walls were then patched and plaster skimmed complete ready to take a paint finish.

    Once all walls were completely dry, we then went onto fitting the new kitchen with a rise and fall sink-hob so as the less able-bodied users would be able to fully operate all appliances.

    A splash back tile was fitted and the kitchen was painted throughout including the new door and frame. The floor was covered with a non-slip commercial vinyl floor, including a cap cove skirting board for hygiene and easy cleaning.

    On completion of the works a full builders clean was undertaken and all relevant certificates appliance manuals were given to the client.

    Mrs. S. Flaherty, housekeeper, told us, “that’ they needed to brighten up the lounge as the residents spent a lot of time in there.

    It was also important that they were given a kitchen in which the service users had the opportunity to cook and bake various food, but they wouldn’t be able to do that with the existing kitchen, so they needed a kitchen that would be more suitable for the less able bodied service users.

    John came down to site to discuss what they could do for us and how long it would take him to complete, as we had already been using John for other numerous building & refurbishment work around the home we decided to use him for both of theses projects.

    Now the work is completed, the residents are a lot happier to sit in the lounge and they also have the opportunity to cook and bake various food. We couldn’t have been happier with what John and his team have done for us”.

    So, if you’d like the same high level of service as Mrs. Flaherty, please call us for a friendly chat on 0121 258 3440 or alternatively, send us your enquiry online or email us at info@apple-solutions.co.uk and we’ll get back to you soon.

    You may also like to find out more about us, discover the reasons why you should choose us, or request a copy of our guide to extensions or guide to choosing the right builder.

    Construction Services

    Trust Mark Construction Line Chas Trust Mark Cscs

  • Commercial Case Study – Leonard Cheshire Disability

    Main

    Client Leonard Cheshire Disability
    Location Bedworth, West Midlands
    Project Office alterations

    As Leonard Cheshire were relocating their office from unit 6a to unit 8, we carried out some alterations to unit 8 before they relocated.

    This involved forming a stud partition wall from one end of the room to the other, which would then create two additional offices for storage and office  staff.

    We fitted some additional fire/smoke alarms, along with a complete intruder alarm system.
In unit 6a we had to bring the inside back to where it was originally before they moved in, this involved disconnecting the power supply and making safe of all the electrics.

    Once this was complete we could then take down the existing partition wall that they had erected when they first moved in, all walls, skirting boards and doors received a fresh coat of paint.

    All the existing carpet was lifted and the floor was replaced with a new commercial hard wearing carpet, we then performed a periodic survey of all electrics and gave the client the NICEIC electrical certificates.

    Mr. Stevenson projects manager told us that, “Leonard Cheshire was relocating there offices as they needed more space in the office, but moving from the one office to the other needed to be done efficiently and smoothly as possible.

    After a meeting with John and he’s surveyor to discuss time frames and the schedule of works, I decided to use John for the job as he had already completed numerous contracts on other Leonard Cheshire sites around the country, to a high standard.

    Once John’s team started work everything went quickly, smoothly and most importantly, without any hassle or major disruption, I will look forward to placing more order with John and completing more contracts in the near future.”

    So, if you’d like the same high level of service as Mr. C  Stevenson, please call us for a friendly chat on 0121 258 3440 or alternatively, send us your enquiry online or email us at info@apple-solutions.co.uk and we’ll get back to you soon.

    You may also like to find out more about us, discover the reasons why you should choose us, or request a copy of our guide to extensions or guide to choosing the right builder.

    Construction Services

    Trust Mark Construction Line Chas Trust Mark Cscs

  • Commercial Case Study – Leonard Cheshire Disability

    Main

    Client Leonard Cheshire Disability
    Location Alfreton, Derbyshire
    Project Toilet alteration – building & refurbishment.

    For many people living in Derbyshire, public places and community facilities are not accessible because their personal care needs cannot be met in standard accessibility toilets (disabled toilets).

    This affects all those people who require the support of carers and specialist facilities, such as a hoist, to help make their lives easier.

    To make this possible we had to make safe and disconnect the existing plumbing as well as strip out and take down the diving wall between the male toilets and the standard accessible toilet (disabled toilet) We also had to alter the existing toilet cubicles to give us the room required to form a larger toilet area to accommodate a hoist.

    Next we formed the new walls from timber stud, insulation and plasterboard, followed by the existing suspended ceiling, which was then altered around the new walls.

    Once those walls were in place, the floor was latexed ready to receive the new commercial none slip vinyl floor. We fitted the new toilet suite.

    In addition we changed the inset bowls and taps to the vanity unit within the female toilets, all walls were then painted throughout so as to give the toilet a new fresh look.

    On completion of the works a full builders clean was completed and then the job was handed over to the client.

    Mr. C. Stevenson of Leonard Cheshire disability told us, “We needed to make the toilet fully accessible and this would involve alterations to the original layout so as to accommodate the new hoist and give a larger toilet. After a meeting with John on site to discuss exactly was what required by ourselves and Derbyshire Council, I decided to use John to do the work as he had already completed numerous building & refurbishment contracts on other Leonard Cheshire sites around the country, to a high standard and a very professional manner. Once John’s team started work everything went quickly, smoothly and most importantly, without any hassle or major disruption, I will look forward to working with John and his team in the near future”.

    toilet fully accessible and this would involve alterations to the original layout so as to
    accommodate the new hoist and give a larger toilet.
    After a meeting with John on site to discuss exactly was what required by ourselves
    and Derbyshire Council, I decided to use John to do the work as he had already
    completed numerous contracts on other Leonard Cheshire sites around the country,
    to a high standard and a very professional manner.
    Once John’s team started work everything went quickly, smoothly and most
    importantly, without any hassle or major disruption, I will look forward to working
    with John and his team in the near future”.

    So, if you’d like the same high level of service as Mr.C. Stevenson, please call us for a friendly chat on 0121 258 3440 or alternatively, send us your enquiry online or email us at info@apple-solutions.co.uk and we’ll get back to you soon.

    You may also like to find out more about us, discover the reasons why you should choose us, or request a copy of our guide to extensions or guide to choosing the right builder.

    Construction Services

    Trust Mark Construction Line Chas Trust Mark Cscs

  • Commercial Case Study – Kuehne + Nagel Ltd

    Picture 01 main

    Client Kuehne + Nagel Ltd
    Location Minworth, Birmingham
    Project Industrial canteen build – from design to completion.

    After a few initial visits with our architect to finalise the drawings and designs we had produced, we then went onto writing a full schedule of works for the client.

    To create the required canteen area we had to first fire proof the mezzanine floor by coating the existing steels with intumescent paint, and double plaster boarding the underneath of the floor to create an adequate fire break and to comply with fire regulations.

    Once that was complete we started forming the walls from plasterboard and metal stud partitioning, leaving spaces for the new aluminium fire rated windows, doors and door frames, We then fitted a suspended ceiling, a hot and cold air conditioning system, along with a sink for staff washing facilities, and a new non-slip commercial vinyl floor.

    Mr.K.Green from Kuehne + Nagel told us, “With the company employing more staff, we knew we needed a bigger canteen area, so we looked into having one built and after speaking with one or two building and refurbishment contractors we came across Apple Solutions.

    After a few initial meeting with John and his team we realised that John would be able to give us a complete service from having the drawing designed to dealing with the local authorities building inspector, this would leave me free to concentrate on other issues.

    Once John’s team started work everything went smoothly, with a safe and professional manner and, most importantly, without any hassle or major disruption. Most of all he dealt with everything from design to completion.

    Now our canteen is finished it not only looks great but also gives us exactly the space we needed for the new employee’s. We couldn’t have been happier with what John and his team have done for us, and we will definitely be asking him to look at future projects for us’’

    So, if you’d like the same high level of service as Mr.K.Green, please call us for a friendly chat on 0121 258 3440 or alternatively, send us your enquiry online or email us at info@apple-solutions.co.uk and we’ll get back to you soon.

    You may also like to find out more about us, discover the reasons why you should choose us, or request a copy of our guide to extensions or guide to choosing the right builder.

    Construction Services

    Trust Mark Construction Line Chas Trust Mark Cscs

Construction Services Trust Mark Construction Line Chas Trust Mark Cscs