Ermington Crescent, Hodge Hill, Birmingham
Background
This project comprised of a complete renovation.
The existing bathroom and toilet was stripped out along with all the existing pipe work, electrical wiring, doors, door frames, skirting boards and all wall paper.All ceilings were plaster boarded and the whole property was plastered throughout. A new bathroom and kitchen was fitted. The dividing wall between the kitchen and lounge was opened up to give a bigger kitchen and to achieve a kitchen stroke dining room area which was fitted with an oak laminate floor.A hardwood stable back door was fitted to alow a good air flow during them hot summer days, a full electrical rewire and central heating system was completed. New skirting boards, door frames and doors were also fitted.
The property was painted throughout with neutral colours to give the desired finish.
Contract Details
Location Hodge Hill Birmingham
Start Date August 2008
Completion Date September 2008
No. of Accidents 0
Contract Type Development