<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Apple Solutions</title>
	<atom:link href="http://www.apple-solutions.co.uk/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.apple-solutions.co.uk</link>
	<description>Just another WordPress weblog</description>
	<lastBuildDate>Fri, 26 Feb 2010 15:01:48 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.4</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Leonard Cheshire Disability</title>
		<link>http://www.apple-solutions.co.uk/599/</link>
		<comments>http://www.apple-solutions.co.uk/599/#comments</comments>
		<pubDate>Fri, 26 Feb 2010 00:13:16 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Commercial]]></category>

		<guid isPermaLink="false">http://www.apple-solutions.co.uk/?p=599</guid>
		<description><![CDATA[As Leonard Cheshire were relocating there office from unit 6a to unit 8, we carried out some alterations to unit 8 before they relocated.]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.apple-solutions.co.uk/wp-content/uploads/2010/02/Picture-016.jpg" rel="lightbox[599]"><img class="alignnone size-full wp-image-624" style="border: 10px solid white;" title="Picture 016" src="http://www.apple-solutions.co.uk/wp-content/uploads/2010/02/Picture-016.jpg" alt="Picture 016" width="602" height="336" /></a></p>
<h2>Background</h2>
<p>As Leonard Cheshire were relocating there office from unit 6a to unit 8, we carried out some alterations to unit 8 before they relocated, this involved</p>
<p>Forming a stud partition wall from one end of the room to the other which would then create two additional offices for storage and office staff.</p>
<p>We fitted some additional fire/smoke alarms, along with a complete intruder alarm system.<br />
In unit 6a we had to bring the inside back to where it was originally before they moved, this involved disconnecting the power supply and making safe of all electrics.</p>
<p>Once this was complete we could then take down the existing partition wall that they had erected when they first moved in, all walls and timber work received a fresh coat of paint.</p>
<p>All the existing carpet was lifted and replace with new, we then performed a pedeoric survey off all electrics</p>
<h2>Project Address</h2>
<table border="0" cellspacing="0" cellpadding="0" width="248">
<tbody>
<tr>
<td width="248" valign="bottom"><strong>Unit   6a/8  Stephenson Court</strong></td>
</tr>
<tr>
<td width="248" valign="bottom"><strong>Priory   Business Park</strong></td>
</tr>
<tr>
<td width="248" valign="bottom"><strong>Fraser Road</strong></td>
</tr>
<tr>
<td width="248" valign="bottom"><strong>Bedford</strong></td>
</tr>
<tr>
<td width="248" valign="bottom"><strong>MK44 3WJ</strong></td>
</tr>
</tbody>
</table>
<h2></h2>
<p></p>
<h2>Contract Details</h2>
<p><strong>Start Date</strong> June 2009<br />
<strong> Completion Date </strong>July 2009<br />
<strong>No. of Accidents </strong>0<br />
<strong>Contract Type </strong>Office Alterations</p>
]]></content:encoded>
			<wfw:commentRss>http://www.apple-solutions.co.uk/599/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Genesis Family Entertainment Centre</title>
		<link>http://www.apple-solutions.co.uk/genesis-family-entertainment-centre/</link>
		<comments>http://www.apple-solutions.co.uk/genesis-family-entertainment-centre/#comments</comments>
		<pubDate>Thu, 25 Feb 2010 17:51:39 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Commercial]]></category>

		<guid isPermaLink="false">http://www.apple-solutions.co.uk/?p=575</guid>
		<description><![CDATA[Partnership working between Derbyshire County Council, Leonard Cheshire Disability and the Genesis Centre has resulted in the provision of a ‘changing places facility’ within the Genesis Family Entertainment Centre.]]></description>
			<content:encoded><![CDATA[<h2><a href="http://www.apple-solutions.co.uk/wp-content/uploads/2010/02/headerpic.jpg" rel="lightbox[575]"></a><a href="http://www.apple-solutions.co.uk/wp-content/uploads/2010/02/headerpic.jpg" rel="lightbox[575]"></a><a href="http://www.apple-solutions.co.uk/wp-content/uploads2010/02/headerpic.jpg" rel="lightbox[575]"><img class="alignnone size-full wp-image-480" title="" src="http://www.apple-solutions.co.uk/wp-content/uploads/2010/02/headerpic.jpg" alt="s" width="602" height="336" /></a></h2>
<h2>Background</h2>
<p>This Project was awarded to Apple Solutions Ltd.<br />
For many people living in Derbyshire, public places and community facilities are not accessible because their personal care needs cannot be met in standard accessible toilets (disabled toilets).This affects all those people who require the support of one or two carers and /or a hoist and changing bed; adults, children and some older people.</p>
<p><strong>“Changing Places”</strong> is a specification for fully accessible public toilets</p>
<p>Partnership working between Derbyshire County Council, Leonard Cheshire Disability and the Genesis Centre has resulted in the provision of a ‘changing places facility’ within the Genesis Family Entertainment Centre.  Disabled people visiting Alfreton can access the facility by using a radar key between 8.30am and 10pm weekdays and 9.00am and 10pm at weekends.</p>
<h2>Contract Details</h2>
<p><strong>Location</strong> Derbyshire<br />
<strong> Start Date</strong> January 2010<br />
<strong> Completion Date</strong> February 2010<br />
<strong>No. of Accidents</strong> 0<br />
<strong>Contract Type</strong> Toilet Alterations</p>
]]></content:encoded>
			<wfw:commentRss>http://www.apple-solutions.co.uk/genesis-family-entertainment-centre/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Apple Solutions new website goes live!</title>
		<link>http://www.apple-solutions.co.uk/new_website/</link>
		<comments>http://www.apple-solutions.co.uk/new_website/#comments</comments>
		<pubDate>Mon, 14 Sep 2009 17:25:03 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://lhmlinux01:1053/?p=56</guid>
		<description><![CDATA[Our new site is live!]]></description>
			<content:encoded><![CDATA[<p><strong>Our new website went live today!</strong></p>
<p>You can find out about the sectors we work in and see a large portfolio of projects in our <a href="/case-studies/">Case Studies</a> section.</p>
<p>If you would like to leave some feedback, please go to the blog and let us know what you think, we&#8217;d love to hear from you.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.apple-solutions.co.uk/new_website/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Garden Invaders &#8211; BBC TV 2005</title>
		<link>http://www.apple-solutions.co.uk/garden-invaders-bbc-tv-2005/</link>
		<comments>http://www.apple-solutions.co.uk/garden-invaders-bbc-tv-2005/#comments</comments>
		<pubDate>Wed, 09 Sep 2009 11:10:04 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Building & Consultancy]]></category>

		<guid isPermaLink="false">http://lhmlinux01:1053/?p=117</guid>
		<description><![CDATA[The works were required as part of the BBC TV series Garden Invaders. The project involved construction and landscaping works that included bricklaying, slabbing and trestle work.]]></description>
			<content:encoded><![CDATA[<h2><a href="http://www.apple-solutions.co.uk/wp-content/uploads/2009/09/Untitled-1.jpg" rel="lightbox[117]"></a><a href="http://www.apple-solutions.co.uk/wp-content/uploads/2009/09/bbc-garden-invaders.jpg" rel="lightbox[117]"></a><a href="http://www.apple-solutions.co.uk/wp-content/uploads/2009/09/bbc-garden-invaders.jpg" rel="lightbox[117]"><img class="alignnone size-full wp-image-480" title="BBC Garden Invaders" src="http://www.apple-solutions.co.uk/wp-content/uploads/2009/09/bbc-garden-invaders.jpg" alt="BBC Garden Invaders" width="602" height="336" /></a></h2>
<h2>Background</h2>
<p>The works were required as part of the BBC TV series Garden Invaders. The project involved construction and landscaping works that included bricklaying, slabbing and trestle work.</p>
<p>This was a complete garden make over which was successfully completed within the day.</p>
<h2>Contract Details</h2>
<p><strong>Location </strong>Northampton<strong><br />
Start Date:</strong> September 2005<br />
<strong>Completion Date</strong>: September 2005<br />
<strong>No. of Accidents</strong>: 0<br />
<strong>Contract Type</strong>: Build Only</p>
]]></content:encoded>
			<wfw:commentRss>http://www.apple-solutions.co.uk/garden-invaders-bbc-tv-2005/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>New Apple Solutions website</title>
		<link>http://www.apple-solutions.co.uk/new-website/</link>
		<comments>http://www.apple-solutions.co.uk/new-website/#comments</comments>
		<pubDate>Wed, 02 Sep 2009 10:38:18 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Blog]]></category>

		<guid isPermaLink="false">http://lhmlinux01:1053/?p=114</guid>
		<description><![CDATA[Our new site is live!]]></description>
			<content:encoded><![CDATA[<p>After many years of having our existing website, we thought it was time to update it.</p>
<p>Our new site now offers more photography, more information and more <a href="/case-studies/">Case Studies</a>!</p>
<p>We also have new News and Blog, this will allow you to keep up to date with the projects that we&#8217;re working on and will also enable you to post any comments or questions you may have.</p>
<p>We hope you like the new site, if you have any questions or comments, please feel free to enter them below or <a href="/contact-us/">click here</a> to send us an email.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.apple-solutions.co.uk/new-website/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Leonard Cheshire Disability &#8211; Web Heath, Redditch</title>
		<link>http://www.apple-solutions.co.uk/leonard-cheshire-disability/</link>
		<comments>http://www.apple-solutions.co.uk/leonard-cheshire-disability/#comments</comments>
		<pubDate>Sat, 07 Feb 2009 15:33:50 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Commercial]]></category>

		<guid isPermaLink="false">http://lhmlinux01:1053/?p=272</guid>
		<description><![CDATA[The Project involved bringing the home up to date with current fire regulations, after a fire risk assessment was carried out by the local fire officer.]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.apple-solutions.co.uk/wp-content/uploads/2009/09/leonard-cheshire-disability.jpg" rel="lightbox[272]"><img class="alignnone size-full wp-image-271" title="Leonard Cheshire Disability" src="http://www.apple-solutions.co.uk/wp-content/uploads/2009/09/leonard-cheshire-disability.jpg" alt="Leonard Cheshire Disability" width="602" height="336" /></a></p>
<h2>Background</h2>
<p>This Project was awarded to Apple Solutions Ltd.</p>
<p>The Project involved bringing the home up to date with current fire regulations, after a fire risk assessment was carried out by the local fire officer.</p>
<p>Our works was to replace all fire doors to the service user’s rooms on one particular wing, and to replace all fd30 intumescent fire strips to all new doors, and existing doors, we also had to ensure that all existing doors were working correctly.</p>
<p>Once all new doors were fitted they were painted to the client’s specification, and all associated ironmongery was fitted.  Due to the satisfaction of the area projects manager we went on to completing two other sites, of similar nature.</p>
<h2>Contract Details</h2>
<p><strong>Location </strong>Web Heath, Redditch<br />
<strong>Start Date</strong> February 2009<br />
<strong>Completion Date </strong>March 2009<br />
<strong>No. of Accidents</strong> 0<br />
<strong>Contract Type</strong> Alterations</p>
]]></content:encoded>
			<wfw:commentRss>http://www.apple-solutions.co.uk/leonard-cheshire-disability/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Kuehne + Nagel Ltd &#8211; Mid Point Park Minworth, Birmingham</title>
		<link>http://www.apple-solutions.co.uk/kuehne-nagel-ltd-mid-point-park-minworth-birmingham/</link>
		<comments>http://www.apple-solutions.co.uk/kuehne-nagel-ltd-mid-point-park-minworth-birmingham/#comments</comments>
		<pubDate>Wed, 07 Jan 2009 15:19:56 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Commercial]]></category>

		<guid isPermaLink="false">http://lhmlinux01:1053/?p=266</guid>
		<description><![CDATA[The project involved forming a new canteen area and a self contained fire exit within the warehouse above the mezzanine floor area, this was constructed out of metal stud and plasterboard, with three windows, two in the canteen area and one at the top of the fire escape staircase looking down onto the warehouse floor.]]></description>
			<content:encoded><![CDATA[<h2><img class="alignnone size-full wp-image-488" title="K+N01" src="http://www.apple-solutions.co.uk/wp-content/uploads/2009/01/K+N01.jpg" alt="K+N01" width="602" height="336" /></h2>
<h2>Background</h2>
<p>This project was awarded to Apple Solutions Ltd.</p>
<p>The project involved forming a new canteen area and a self contained fire exit within the warehouse above the mezzanine floor area, this was constructed out of metal stud and plasterboard, with three windows, two in the canteen area and one at the top of the fire escape staircase looking down onto the warehouse floor.</p>
<p>A suspended ceiling was then fitted. A sink base unit was fitted with a over sink water heater. All air condition was completed and all associated electrical works. A poly safe vinyl floor was laid to the canteen floor and other areas within the warehouse. The canteen on the ground floor was then converted to female and male lockers rooms, the floors were painted with industrial paint, the windows were blanked out and the ceiling tiles were replaced.</p>
<h2>Contract Details</h2>
<p><strong>Location </strong>Birmingham<strong><br />
Start Date</strong> January 2009<br />
<strong>Completion Date</strong> February 2009<br />
<strong>No. of Accidents</strong> 0<br />
<strong>Contract Type</strong> Warehouse Alterations</p>
]]></content:encoded>
			<wfw:commentRss>http://www.apple-solutions.co.uk/kuehne-nagel-ltd-mid-point-park-minworth-birmingham/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Midland Heart Regeneration &#8211; 165 Heathfield Rd, Hansworth</title>
		<link>http://www.apple-solutions.co.uk/midland-regeneration/</link>
		<comments>http://www.apple-solutions.co.uk/midland-regeneration/#comments</comments>
		<pubDate>Wed, 08 Oct 2008 14:55:00 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Commercial]]></category>

		<guid isPermaLink="false">http://lhmlinux01:1053/?p=247</guid>
		<description><![CDATA[Handsworth and Aston are part of a large regeneration project which has already seen improved safety, environmental and social activities.]]></description>
			<content:encoded><![CDATA[<div class="mceTemp">
<dl id="attachment_500" class="wp-caption alignnone" style="width: 612px;">
<dt class="wp-caption-dt"><img class="size-full wp-image-500 " title="Rebuilding of Bay Window" src="http://www.apple-solutions.co.uk/wp-content/uploads/2008/10/gallery-main.jpg" alt="" width="602" height="336" /></dt>
</dl>
</div>
<h2>Background</h2>
<p>This project was awarded to Mansell Construction services Ltd &#8211; A Balfour Beatty Company.</p>
<p>Handsworth and Aston are part of a large regeneration project which has already seen improved safety, environmental and social activities.</p>
<p>As part of this regeneration Midland Heart has brought to life a range of traditional Victorian homes, many of which for the first time in 20 years are being brought back into use as family homes. Our involvement in the project was to complete all carpentry works, structural works, ceramic floor and wall tiling, underground drainage, boundary walls and all landscaping.</p>
<h2>Contract Details</h2>
<p><strong> Location </strong>Hansworth, Birmingham<br />
<strong>Start Date</strong> October 2008<br />
<strong>Completion Date</strong> December 2008<br />
<strong>No. of Accidents</strong> 0<br />
<strong>Contract Type</strong> Deconversion</p>
]]></content:encoded>
			<wfw:commentRss>http://www.apple-solutions.co.uk/midland-regeneration/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Midland Heart Regeneration &#8211; 2 St Peters Rd, Hansworth</title>
		<link>http://www.apple-solutions.co.uk/midland-heart-regeneration-2-st-peters-rd-hansworth/</link>
		<comments>http://www.apple-solutions.co.uk/midland-heart-regeneration-2-st-peters-rd-hansworth/#comments</comments>
		<pubDate>Tue, 07 Oct 2008 15:06:48 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Commercial]]></category>

		<guid isPermaLink="false">http://lhmlinux01:1053/?p=254</guid>
		<description><![CDATA[Handsworth and Aston are part of a large regeneration project which has already seen improved safety, environmental and social activities.]]></description>
			<content:encoded><![CDATA[<h2><a href="http://www.apple-solutions.co.uk/wp-content/uploads/2009/09/midland-regeneration4.jpg" rel="lightbox[254]"><img class="alignnone size-full wp-image-262" title="midland-regeneration" src="http://www.apple-solutions.co.uk/wp-content/uploads/2009/09/midland-regeneration4.jpg" alt="midland-regeneration" width="602" height="336" /></a></h2>
<h2>Background</h2>
<p>This project was awarded to Mansell Construction services Ltd &#8211; A Balfour Beatty Company.</p>
<p>Handsworth and Aston are part of a large regeneration project which has already seen improved safety, environmental and social activities. As part of this regeneration Midland Heart has brought to life a range of traditional Victorian homes, many of which for the first time in 20 years are being brought back into use as family homes. Our involvement in the project was to complete all carpentry works, structural works, ceramic floor and wall tiling, underground drainage, boundary walls and all landscaping.</p>
<h2>Contract Details</h2>
<p><strong>Location </strong>Hansworth Birmingham<strong><br />
Start Date</strong> October 2008<br />
<strong>Completion Date</strong> January 2009<br />
<strong>No. of Accidents</strong> 0<br />
<strong>Contract Type </strong>Deconversion</p>
]]></content:encoded>
			<wfw:commentRss>http://www.apple-solutions.co.uk/midland-heart-regeneration-2-st-peters-rd-hansworth/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Ermington Crescent, Hodge Hill, Birmingham</title>
		<link>http://www.apple-solutions.co.uk/ermington-crescent-hodge-hill-birmingham/</link>
		<comments>http://www.apple-solutions.co.uk/ermington-crescent-hodge-hill-birmingham/#comments</comments>
		<pubDate>Fri, 08 Aug 2008 09:11:00 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Residential]]></category>

		<guid isPermaLink="false">http://lhmlinux01:1053/?p=305</guid>
		<description><![CDATA[The existing bathroom and toilet was stripped out along with all the existing pipe work, electrical wiring, doors, door frames, skirting boards and all wall paper.All ceilings were plaster boarded and the whole property was plastered throughout.]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.apple-solutions.co.uk/wp-content/uploads/2009/09/ermington-cresent.jpg" rel="lightbox[305]"><img class="alignnone size-full wp-image-306" title="ermington-cresent" src="http://www.apple-solutions.co.uk/wp-content/uploads/2009/09/ermington-cresent.jpg" alt="ermington-cresent" width="602" height="336" /></a></p>
<h2>Background</h2>
<p>This project comprised of a complete renovation.</p>
<p>The existing bathroom and toilet was stripped out along with all the existing pipe work, electrical wiring, doors, door frames, skirting boards and all wall paper.All ceilings were plaster boarded and the whole property was plastered throughout. A new bathroom and kitchen was fitted. The dividing wall between the kitchen and lounge was opened up to give a bigger kitchen and to achieve a kitchen stroke dining room area which was fitted with an oak laminate floor.A hardwood stable back door was fitted to alow a good air flow during them hot summer days, a full electrical rewire and central heating system was completed. New skirting boards, door frames and doors were also fitted.</p>
<p>The property was painted throughout with neutral colours to give the desired finish.</p>
<h2>Contract Details</h2>
<p><strong>Location </strong>Hodge Hill Birmingham</p>
<p><strong>Start Date </strong>August 2008<br />
<strong>Completion Date</strong> September 2008<br />
<strong>No. of Accidents</strong> 0<br />
<strong>Contract Type</strong> Development</p>
]]></content:encoded>
			<wfw:commentRss>http://www.apple-solutions.co.uk/ermington-crescent-hodge-hill-birmingham/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
