Staff Canteen Fit-Out Birmingham – Kuehne + Nagel

Kuehne-Nagel-Ltd-header

New Mezzanine Canteen for Kuehne + Nagel, Minworth

This staff canteen fit-out in Birmingham was a design-and-build project for Kuehne + Nagel, the global logistics company, at their warehouse on an industrial estate in Minworth. With more staff joining the site, they needed a bigger canteen. We created one on an existing mezzanine floor inside the warehouse, handling everything from the drawings to building control.

Designing the staff canteen

We worked with our architect over several site visits to finalise the drawings and design, then put together a full schedule of works for the client. We also dealt with the local authority building inspector, so Kuehne + Nagel’s team could concentrate on running the site.

What the canteen fit-out included

  • The existing mezzanine steelwork fire-proofed with intumescent paint
  • The underside of the mezzanine double-boarded with plasterboard to form a fire break that meets current building regulations
  • New walls built from metal stud partitioning and plasterboard
  • Fire-rated aluminium windows and door frames, with factory-finished FD30 fire doors
  • A new suspended ceiling
  • A hot and cold air conditioning system
  • First- and second-fix electrics
  • A sink for staff washing facilities
  • Non-slip vinyl flooring

The result

Kuehne + Nagel now has a bright, comfortable canteen with exactly the space their growing workforce needed, built safely to current fire regulations. The work went smoothly with no major disruption to the warehouse, and the client said they’d “definitely be asking him to look at future projects”.

Need a staff canteen fit-out in Birmingham?

We design and build canteens, welfare areas and offices for warehouses and factories across Birmingham and the West Midlands, working safely around your operations. See our industrial refurbishment and fire door installation services, or book a free site survey and get a clear, detailed written quote within 2–3 working days.

Kevin Green from Kuehne + Nagel told us

With the company employing more staff, we knew we needed a bigger canteen area, so we looked into having one built and after speaking with one or two building and refurbishment contractors we came across Apple Solutions.

After a few initial meeting with John and he’s team we realised that John would be able to give us a complete service from having the drawing designed to dealing with the local authorities building inspector, this would leave me free to concentrate on other issues.

Once John’s team started work everything went smoothly, with a safe and professional manor and, most importantly, without any hassle or major disruption. Most of all he dealt with everything from design to completion.

Now our canteen is finished it not only looks great but also gives us exactly the space we needed for the new employee’s. We couldn’t have been happier with what John and his team have done for us, and we will definitely be asking him to look at future projects for us.

Before & After

kuehne-nagel-ltdkuehne-nagel-ltd

Gallery

You might also enjoy