Laboratory Refurbishment With New Kitchen & Air Conditioning System
After a few initial visits to complete the survey we were then able to produce a full schedule of works including specification and once we had agreed the schedule, specification and cost with the client we then could start the project.
Firstly we disconnected all electrics and made safe along with the disconnection of all hot and cold water feeds.
All existing kitchens units appliances, floor coverings, suspended ceilings, lighting were stripped out, new stud partition walls were built and plastered, all fire door and frames were replaced, once the alterations to the existing ducting where completed we could then fit the hot and cold air conditioning system followed by a new suspended lay in grid ceiling including all cat 2 lighting required, not forgetting the emergency lighting.
We also organised and completed the fire risk works for the company insurance requirements, fitted the new kitchen, new poly safe vinyl floor covering with cap cove skirting board.
Once all works were completed all rooms and doors were decorated in white to give the desired clinical finish, this was followed by a complete and thorough builders clean.
The client was then handed a well presented file with all electrical, gas, fire certifications for there records.
Khizer Bin-Younos, Site Projects Manager, told us
After deciding we needed our existing laboratory refurbishing and bringing up to modernization, I came across Apple Solutions web site once I had looked through the type of work they did I contacted them and organised a site survey.
After a few initial meeting with John and he’s team I realized they would beable to complete the refurbishment to our requirements, more importantly they could give us a complete service from design to completion, including all full written schedules, and specifications.
Once John’s team started work everything went smoothly, with a safe and professional manor and, most importantly, without any hassle or major disruption. Most of all he was very helpful I can honestly say John and he’s team gave us 100% commitment to finishing the project to a high quality standard, just as he promised.
Now our laboratory refurbishment has been completed we have placed other projects with Apple Solutions , Smoking Shelter,Vinly Floors, factory finished fire check mahogany doors, and powder coated steel hygiene doors which are being fitted around our Burton on Trent site.